Friday, January 25, 2013
Updated Finishes
Spent the week running around South Bend, Mishawaka, Elkhart, and Bremen but it was time well spent. We ordered the fireplace insert, the interior doors and trims, and have made flooring, and back splashes. Still mulling over a few choices but we're getting close. The color isn't great in the pictures. Not pleased with the color in the pictures. They look much better up close.
Monday, January 21, 2013
Kitchen Finishes
Cabinet Layout
Plumbing and Electrical
Haven't posted since before Thanksgiving because not much got done until after the first of the year. The electrical is roughed in and live to the house as of last Friday. The plumbing rough in should be finished midweek. Then inspections, followed by siding and trim outside and insulation and drywall inside.
Subscribe to:
Posts (Atom)