Haven't posted since before Thanksgiving because not much got done until after the first of the year. The electrical is roughed in and live to the house as of last Friday. The plumbing rough in should be finished midweek. Then inspections, followed by siding and trim outside and insulation and drywall inside.
The back of Kabola boiler in the engine room can be seen through the (large for access and ease of use) gap in the bulkhead. Click here
ReplyDelete