Came home from the wedding and saw that the foundation had been poured. Unfortunately, the crawl space floor was supposed to come up over the footings 2". Instead, there is a gap that runs the perimeter between the footings and the crawl space floor. Sure wish things got done right the first time.
No comments:
Post a Comment